Public Records Office Canton Basel-Landschaft

Liestal, Switzerland
Photo © Hannes Henz
Photo © Hannes Henz
Photo © Hannes Henz
Photo © Hannes Henz
Photo © Hannes Henz
Photo © Hannes Henz
Siteplan
Longitudinal section through entrance hall
Ground floor
Architects
EM2N
Location
Wiedenhubstrasse 35, 4410 Liestal, Switzerland
Year
2007
Client
Canton Basel-Landschaft - represented by the Building Department Canton Basel-Landschaft
Type of Commission
Competition
Competition
2000, 1st prize
Planning phase
2001–2007
Start of construction
05.2005
Completion
06.2007
Space Program
Shelter rooms for cultural assets, archive extension, new office spaces for archivists, customers area and reading room
Footprint
1160 m2
Gross floor area
4705 m2
Gross volume
17809 m3

The Public Record Office is the collective memory of the political, economic and cultural life of a canton. Consequently, a suitable urban location and appropriate architectural expression are of central importance.

The current location of the existing office, amidst smaller and larger residential buildings cut off from the town centre by the railway line, hardly allows the public character of the institution to be expressed. We interpreted the need to double the amount of space at this location as a chance to translate the existing building into a powerful, self–confident form. We added an additional storey to the archive wing, although the competition brief explicitly excluded it. As a consequence the spatial programme is no longer organised horizontally but vertically. By placing the public zone on the second floor the visitors’ area is lifted out of the cramped topography. In the form of a glazed roof volume the new public zone now engages the urban district of Liestal, which lies on the far side of the railway line embankment. The vertical extension also allows the volume to be kept as compact as possible. The existing and the new levels form a single entity.

The outermost layer of the archive façade is clothed in ivy and becomes a ‘soft’ plinth on which the precisely cut top floor sits. The planting of the façade meets various requirements of building physics by providing protection against driving rain and forming a climatic balancing layer. In addition the planting signalises the building’s special function and, with its organic softness, connects the building to the small–scaled green location.

Related Projects

  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressiver Reinraumausbau
    Lindner Group
  • Büro Allmendstrasse
    BFB Architekten AG

Magazine

Other Projects by EM2N

Heuried Sports Centre
Zürich, Switzerland
Lucerne School of Art and Design
Emmenbrücke, Switzerland
IM VIADUKT – Refurbishment Viaduct Arches
Zurich, Switzerland
Keystone Office Building
Prague, Czech Republic
Cinémathèque suisse
Penthaz, Switzerland