Modular prefabricated house S+V

Visualisierung © Sadar+Vuga
Visualisierung © Sadar+Vuga
Visualisierung © Sadar+Vuga
Visualisierung © Sadar+Vuga
Visualisierung © Sadar+Vuga
Visualisierung © Sadar+Vuga
Zeichnung © Sadar+Vuga
Architekten
Sadar+Vuga
Jahr
2015

Type
modular prefabricated house

Source
project commission

Client
Marles d.o.o.

Total floor area
178 m2

Storeys
ground floor

Program
one family house with covered parking and outdoor area

Structure
wooden frame + panels

Cladding
wooden colored wall, opaque glass, mesh blinds, glass sliding walls

The Modular prefabricated house S+V is a free-standing, ground floor, residential structure, which combines modern building technologies of prefabricated wooden structures with an eco-friendly design, providing maximum comfort all year round.

The house is based on a 4.4m x 4.4m x 2.5m wooden construction grid providing the future client with different layout possibilities in accord to their needs and desires. The grid is filled with various panels: wooden partition wall panels, coloured wooden facade panels and glass sliding panels. Through the catalogue selection of the appropriate wall and facade panels, as well as through the close collaboration with the architects, the future Modular house S+V dweller can develop the design most suitable to his lifestyle. The construction grid is placed on top of the concrete base slab, which expands beyond the house’s outline. Here the outer living areas appear covered by three stripes of a wavy roof with laminated wooden beams.

The stripes of the roof are shifted in such a way that openings are generated in between, enabling natural illumination and ventilation of the interior. The wavy roof contributes to the energy efficiency of the proposed house design.

The white wavy roof, the wooden construction and coloured facade panels result in a memorable image of a completely modular and prefabricated house S+V.

The house can be placed into different landscapes, from the Mediterranean and lowland to the hilly and alpine. Because of its flexibility, the house can be programmed either for permanent living or for a weekend home.

The construction period of the Modular prefabricated house S+V, from the foundations set up to the actual moving in, takes 5-6 months.

Dazugehörige Projekte

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazin

Andere Projekte von Sadar+Vuga

HSV Apartment
City Center, Ljubljana, Slowenien
New Building for the Study of Social Work (SOAG)
Ghent, Belgien
Air Traffic Control Centre
Ljubljana, Slowenien
Apartment House Zvezda
Nova Gorica, Slowenien
Central Part of the National Gallery
Ljubljana, Slowenien