Thermal Baths Oberlaa
Photo © Marc Walser
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Thermal Baths Oberlaa
Photo © Cathrine Stukhard
Ground floor
Drawing © 4a Architekten GmbH
Concept sketch
Drawing © 4a Architekten GmbH

Vienna Thermal Baths

 Back to Projects list
Location
Kurbadstraße 14, 1100 Vienna, Austria
Year
2011

New construction of a landscape experience in the spa gardens Vienna Oberlaa.

The driving force behind the design concept of the spa resort is nature itself: Imbedded in the spa gardens Wien Oberlaa the central motif is a stream that winds and washes through and around stones, becoming sometimes narrower, sometimes wider. The starting point is one of two thermal springs. The building follows its course in a meandering topographical flow, downwards towards the south, washing over and around individual theme stones that project like large river pebbles from the roof landscape. The spa ensemble, which reaches three storeys at its highest point, fits in perfectly with its surroundings, and its sunbathing lawns form a gentle transition between the various outdoor pools and the surrounding park. The reference to water and to the landscape is always noticeable to the visitor. However, the topic of nature was picked up in the design of the thermal bath not only spatially but also with regard to the choice of materials and colours. The four seasons served as the model for the different ceiling areas. Atmospheric photos of spring, summer, autumn and winter have been graphically simplified, converted into an abstract colour pattern and then transferred onto the acoustic panels. The colour and light mood thereby produced allows ever new and exciting spatial impressions to arise.

Client
VAMED Standortentwicklung & Engineering

Construction period
10/2007 until 05/2011

Construction costs
approx. 115 million euros

Gross floor area
approx. 64000 m²

Gross cubic volume
approx. 325000 m³

Service phases
1 to 5, in part 8, artistic management

Project team
Holger Buchheim, Annette Broos, Barbara Croonenberg, Andreas Ditschuneit (project management), André Georg, Torsten Hannig, Kathrin Hauth, Stephanie Hönn, Izabella Hüttig, Anja Cathrin Maurer, Sibylle Müller, Natascha Ockert, Tanja Otte, Artur Pauli Marco Petters, Christoph Schäfer, Martin Schweizer, Laura Staib, Konstanze Stosberg

Other Projects by 4a Architekten

Indoor swimming pool Schwabach
Schwabach, Germany
Solebad Bad Wimpfen
Bad Wimpfen, Germany
Hirschbach Aquatic Centre
Aalen, Germany
Baden-Württemberg Guarantee Bank
Stuttgart, Germany
Stutensee Indoor Swimming Pool
Stutensee, Germany