TTR Reutlingen Office and Laboratory Building – 5th Construction Phase

Reutlingen, Germany
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Architects
a+r Architekten
Location
Reutlingen, Germany
Year
2017
Client
TTR GmbH

The new office and laboratory building of TTR GmbH, together with the fourth construction phase that we implemented between 2013 and 2014, defines the future centre of the technology park in Reutlingen. Due to its special location and the optional gastronomic use on the ground floor facing the square, the H-shaped floor plan typology, which is considered ideal for the business incubators, was slightly modified and further developed in the area of the central entrance core. As a result, the new building deliberately deviates from the otherwise highly symmetric existing buildings. The U-shaped structure allows for the division into flexible rental units that are accessed via the central core. On the two upper levels, it is possible to create self-contained rental areas facing east, south and west. The basement level provides parking spaces with direct access to the foyer.

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by a+r Architekten

Kulturbahnhof Aalen
Aalen, Germany
Extension of the Pfahlbaumuseum Unteruhldingen
Uhldingen-Mühlhofen, Germany
Kinderhaus Wieseneck
Göppingen, Germany
Cameo Headquarters
Desenzano, Italy
Entrepreneurship Center Garching
Garching, Germany