© Stefan Klomfass, Frankfurt
© Stefan Klomfass, Frankfurt
© Stefan Klomfass, Frankfurt
© Stefan Klomfass, Frankfurt
© Stefan Klomfass, Frankfurt
© Stefan Klomfass, Frankfurt
© Stefan Klomfass, Frankfurt
© SCHOYERER ARCHITEKTEN

Floodwater pumping station

 Back to Projects list
Location
Mainz, Germany
Year
2009
Client
Stadt Mainz - Wirtschaftsbetrieb Betriebszweig Entwässerung

Through a bypass channel of 3 m diameter and a flow rate up to 22.000 l/sec. (statistic 20 year flood water) the surface water of the complete city area can be drained off into the river Rhine. At a 5 year Rhine flood level two pumps transport the city surface water into the river Rhine. One of the biggest flood prevention lifting shields worldwide (7,20 m high and 3,70 wide) protects the inner city of Mainz from a statistically 200 years Rhine flood, from a backwater into the local sewer system. With the total height of 8,50 meters, the visible part of the building is just the "tip of the iceberg", the bottom edge of the pit is 16 m under the surface. The orientation of the pumping station is directed to the flow of the river Rhine, its volume expresses the huge amount of water which must be transported into the river in case of emergency.

The pumping station is situated at the northwest side of the former inland port near to the Kaiser Bridge in Mainz. Due to the changes in urban character from an industrial area to a new residential city quarter, the surrounding area within the pumping station along the promenade will be rejuvenated. In accordance with its prominent location within a new recreation area, the client made the decision for a sustainable design. With the help of the representatives of the city and the technical constructor it was possible to bring the technical installations from an enclosed machine park into a building shell placed at the promenade.

Company and technical buildings are technical infrastructure of a city and are usually errected with the minimum of attention to design and architecture, largely being considered pragmatic buildings that have to be economical efficient in terms of construction costs. These irrelevant shapes are therefore often the basis for neglect and vandalism which results in continuous renovation costs, such buildings rarely achieve display any architectural quality. With this in mind the client decided to adopt an alternative approach developing the Rhine promenade of the new city quarter "Zollhafen" with the intent of contributing to the urban environment. There is no typology for pumping stations, however it was important to the architects to design a building which displays the workings of a pumping station to its environment. The window and seamless building, in terms of an "architecture parlante" (C.N. Ledoux 1736-1806), is a pure and heavy monolith, resting on a vein of water regulating the stream. The surface of the charcoal grey concrete cube with folded sides and eaves edges has a, from stone masons, textured hand hammered finish over its entire surface. Through the 30 mm deep rawness of the surface, nothing reminds on the conventional build-up process. The folded sides produce light and shaded edges and the rawness of the surface increases the interaction of sidelight, full covered illumination and shadows.

Planning and Construction time
2007-2009

Costs
ca. 6,2 Mio. EUR

Other Projects by SCHOYERER ARCHITEKTEN_SYRA

Fahrradparkhaus Mainz
Mainz, Germany
Gleichrichterwerk Rennbahnstraße
Frankfurt am Main, Germany
MAP-Sportsclub
Mainz, Germany
Brücken am Deutzer-Hafen
Köln, Germany
IGA Brückenbauwerke Lünen
Lünen, Germany