Photo © Gatermann + Schossig I Foto Jens Willebrand
Photo © Gatermann + Schossig I Foto Jens Willebrand
Photo © Gatermann + Schossig I Foto Jens Willebrand
Photo © Gatermann + Schossig I Foto Jens Willebrand
Photo © Gatermann + Schossig I Foto Jens Willebrand
Photo © Gatermann + Schossig I Foto Jens Willebrand
Drawing © Gatermann + Schossig
Drawing © Gatermann + Schossighttps://www.german-architects.com/#
Drawing © Gatermann + Schossig

N House

 Back to Projects list
Location
Köln, Germany
Year
2013
LPH
1-9
BGF
237 m²
BRI
825 m³
Energie
56,09 KWh/m²a um 35% besser als EnEV
Auszeichnungen
Iconic Award 2016, Architecture winner | Häuser des Jahres 2014, Die 50 besten Einfamilienhäuser des Jahres 2014 | Heinze Architekten Award, Shortlist 2014

Initial departure point for this design was a site on which, next to the clients’ previous accommodation – a residential block from the 1960s, an independent and expressive new building should be conceived, which should respectfully restrain itself regarding its dominant and listed neighbor. Other integral aspects include a barrier-free plan and lodging for a nurse/caretaker. The result is a building form which pays respect not only to the existing buildings but also to the surrounding landscape with its ponds and trees. At the heart of its composition is a rectangular cube from which masses are subtracted, then elevated and displaced elsewhere. Special uses will therefore be allocated in these double height cubatures, further diverting daylight into the building. The extruded masses allow for terraces to be created within the rectangular roof plan. To provide protection from street noise and to conserve energy, service rooms have been allocated to the North-West façade. This approach corresponds to the closed composition of the North façade and to the open South façade. Through a homogenous metallic façade with window bands, a calm overall composition is achieved. The design of the interiors is the endpoint of the implementation of a wholesome design. A well-tuned energy concept with concrete core activation, an air-to-water heat pump and a controlled central ventilation system accumulates to a low-energy house standard with a lowest primary energy need of 56.09 kWh/m2a. This is 35% below the required energy conservation regulations.

Project Partners
HIG-Hempel Ingenieure, Köln (Statics)
bähr ingenieure, Köln (HVY)
Kress&Adams , Köln (Light)

Client
Private

Gross area
237 sqm

Gross volume
825 cbm

Other Projects by SUPERGELB ARCHITEKTEN

Shipwreck and fishery Museum - Museum Windstärke X
Cuxhaven, Germany
Kontor 19 im Rheinauhafen
Köln, Germany
RömerMuseum im Archäologischen Park Xanten
Xanten, Germany
Capricorn Brücke im Düsseldorfer Medienhafen
Düsseldorf, Germany
Hyatt Pavillons am Rheinboulevard Köln
Köln, Germany