HQ BINST ARCHITECTS

Antwerp, Belgique
HQ BINST ARCHITECTS / ground floor / facade (detail)
Photo © Tim van de Velde
HQ BINST ARCHITECTS / ground floor / facade
Photo © Tim van de Velde
HQ BINST ARCHITECTS / facade with team
Photo © Herman Desmet
HQ BINST ARCHITECTS / ground floor / meeting space
Photo © Tim van de Velde
HQ BINST ARCHITECTS / ground floor / board room
Photo © Tim van de Velde
HQ BINST ARCHITECTS / ground floor / ceiling (detail)
Photo © Tim van de Velde
HQ BINST ARCHITECTS / underground floor / B7
Photo © Tim van de Velde
HQ BINST ARCHITECTS / underground floor
Photo © Tim van de Velde
HQ BINST ARCHITECTS / underground floor / ceiling (detail)
Photo © Tim van de Velde
HQ BINST ARCHITECTS / underground floor / Virtual Reality
Photo © Tim van de Velde
HQ BINST ARCHITECTS / main stairs (detail)
Photo © Tim van de Velde
HQ BINST ARCHITECTS / second floor / work space 2
Photo © Tim van de Velde
HQ BINST ARCHITECTS / first floor / work space 1
Photo © Tim van de Velde
HQ BINST ARCHITECTS / ground floor / terrazzo (detail)
Photo © Tim van de Velde
HQ BINST ARCHITECTS / second floor / work space 2
Photo © Tim van de Velde
HQ BINST ARCHITECTS / under construction
Photo © Binst Architects
HQ BINST ARCHITECTS / under construction
Photo © Binst Architects
HQ BINST ARCHITECTS / main stairs (detail)
Photo © Tim van de Velde
HQ BINST ARCHITECTS / under construction
Photo © Binst Architects
Zuid Antwerpen in the future
Visualisation © Stad Antwerpen
Architectes
Binst Architects
Lieu
Luikstraat 7, 2000 Antwerp, Belgique
Année
2019
Client
Binst Architects
Équipe
Luc Binst, Edwin Remmerie, Wim Heyninck, Ben Depuydt, Kenn van Overveld
Main contractor
Bouwbedrijf P.D.K. nv

OFFICE, INTERIOR
Renovation former warehouse
The building in Luikstraat is a former warehouse that was used to store various materials. After several lives as a dance hall, restaurant, car park and discotheque, the building is now being used as a state-of-the-art office space between the three top museums in Antwerp Zuid.
The façade will be restored to its original appearance. On the ground floor, new arched windows form an addition to the existing façade grid, with a deeper entrance door in the central bay. The whole forms an understated yet stylish look, which is further enhanced by an elegant steel terrace on the first floor.
Inside, each floor has its own character: a ground floor meeting floor with terrazzo floor, an underground lunch room with voids on the front wall, a first work floor with wide wooden plank flooring and under the roof with Polonceau trusses, a completely white workspace with cathedral allure is created. The soul of the building is preserved and together with the finish, forms a powerful whole.

Projets liés

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Wohnbau und Kindergarten Fontanastraße
    GERNER GERNER PLUS
  • GOLD - Wohnbau Goldberg
    GERNER GERNER PLUS
  • BENE - Wohnbau Benedikt
    GERNER GERNER PLUS
  • PUCH - Wohnbau Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Autres projets de Binst Architects

The House of Marketing
Mechelen, Belgique
HQ HUBO
Wommelgem, Belgique
De Boschkens - Noise Barrier Houses
Goirle, Pays-Bas
WOODS
Leuven, Belgique
Park School
Mortsel, Belgique