Garraf Waste Landfill

Begues, Spain
写真 © jordi surroca
© jordi surroca
写真 © jordi surroca
建築家
Batlle | Roig Architects
場所
La vall d'en Joan, Begues, Spain
2020

The Vall d’en Joan waste dump was opened in 1974 in a valley in the limestone massif of El Garraf, in the natural park of the same name.

The restoration project defines a pattern of topographic configuration with terraces, side slopes, drainage system of internal fluids (separated of the external drainage net), biogas extraction net, pathways and plantation by phases.

The whole restoration project goal is that Parc Del Garraf absorbs the dump by using the local forest tissue and supporting the establishment of primary ecosystems and its development and succession which thought the time will turn to adapted situations to the site environment. The plantation process is being done through strong local species with a few pouring demand and already adapted to the place environment. The vegetal structure planned with different local sorts of shrubs (such as bardissa, brolla or mediterranian màquia) and trees organizes the plantation project

関連したプロジェクト

  • Wellness Bogn Sedrun
    Walter Bieler AG
  • Dreifachturnhalle Gipf Oberfrick
    Walter Bieler AG
  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Wohnbau und Kindergarten Fontanastraße
    GERNER GERNER PLUS
  • GOLD - Wohnbau Goldberg
    GERNER GERNER PLUS

Magazine

Batlle | Roig Architects によるその他のプロジェクト

Waste Treatment Facility
Vacarisses, Barcelona, Spain
Recovery of the Old Gypsum Mines of Igualada
Igualada, Barcelona, Spain
New Massimo Dutti Headquarters
Tordera, Spain