Blouin Tardif Architecture-Environnement

BALNEA: Pavillon des arbres

Blouin Tardif Architecture-Environnement
12. november 2014
Photo: Steve Montpetit (All photographs courtesy of v2com)

Health and wellness, gourmet food, yoga, relaxation, sports, massages, rituals baths: BALNEA reinvents the art of living by creating a stunning experience for all the senses. Spa BALNEA’s new reception building, constructed on piles, is nestled unobtrusively in the forest, where it is the hub linking the facility’s existing buildings via outdoor walkways. The resulting new walking routes give clients a more private path through the site. Special attention was paid to preserving trees and the natural surroundings.

Photo: Steve Montpetit

The decision to build the structure from steel made it possible to work with the natural topography, resulting in a very durable, streamlined structure with a more natural profile. The building conveys a sense of lightness under the large wooden volume, making the modular structure seem as though it was gently set down amidst the trees.

Photo: Steve Montpetit

The windows, designed to frame views of the forest landscape, also take advantage of a southern exposure to maximize passive solar heating.

The new building maintains continuity with the older buildings through the use of the same materials (wood siding; windows and building envelope). The steps outside the entrance, reminiscent of a parvis, serve as both an entranceway and a waiting area for events. In addition to the reception area, Pavillon des arbres includes a gift shop, offices and a lounge. The other spa pavilions, devoid of noise inducing activities, provide environments conducive to relaxation.

Photo: Steve Montpetit
Photo: Steve Montpetit
Photo: Steve Montpetit
Photo: Steve Montpetit
Photo: Steve Montpetit
Photo: Steve Montpetit
Photo: Steve Montpetit

Andere artikelen in deze categorie

Ephemeral Bubble
on 18-07-2024
Simone Veil Bridge
on 17-07-2024
The Vibes Co-Space
on 06-03-2024
Beijing City Library
on 26-02-2024
Metropolitan Station
on 20-02-2024