Freitag Factory Maag

Zurich, 瑞士
建筑师
spillmann echsle architekten
年份
2003

The production of FREITAG bags requires a great deal of space. Approximately 2’780 square meters of floor area are needed in order to have the used truck tarps delivered, pulled apart, cut to the rough shape, washed, rolled, tailored, assorted, assembled, sewn together to bags and other items, photographed, stored, packed, stored again and, finally, shipped off. Additional space is taken up by small exhibitions, secondary rooms for the staff and, most of all, for office space.

The built-in office space is in a raised position within the wide-span production hall and offers space for forty workplaces. Out of functional reasons it leans against the old industrial façade. The workplaces for cutting and assembling the tarps are located directly under this new office space. V-shaped props carry the monolithic floor slab. In just a very short time the pre-fabricated, timber constructed walls and ceiling elements were joined together.

On the outside the boxes are clad in roofing paper, plastic cupolas cover the openings. The inside of the boxes presents itself as a warm universe made of PAVATEX.

相关项目

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

杂志

以下出品方的其他项目 spillmann echsle architekten

Halle 550, Zurich-Oerlikon
Apartement House Birchsteg
Zurich, 瑞士
Freitag Shops Worldwide
Freitag Flagship Store
Zurich, 瑞士
On Labs
Zürich, 瑞士