KKE

Chiba, 日本
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
照片 © Forward Stroke Inc.
建筑师
Yo Yamagata Architects
位置
Chiba, 日本
年份
2017

This house was completed as Phase II construction on the same site as KKW, which was completed in 2016.

The garden surrounded by large zelkova and camphor trees on the site and the two houses is the centerpiece of the project, loosely connecting the two houses.
The architecture was designed to be a modest backdrop to the garden.

相关项目

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

杂志

以下出品方的其他项目 Yo Yamagata Architects

US
Saitama, 日本
NA
Tokyo, 日本
UN
Kanagawa, 日本
MS
Shizuoka, 日本
YG
Kanagawa, 日本